Capital One Cafe
Capital One Cafe is a renovation/alteration project at 106 E 6th #100, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2024). The project has an estimated value of $487K across about 4,200 sq ft.
๐Project Metrics
TDLR #TABS2024025335Project Closed
Project has been completed and closed
Capital One Cafe is a Renovation/Alteration project located at 106 E 6th #100, Austin, TX 78701 in Austin, Texas. The project has an estimated value of $487K covering 4,200 sq ft. ECR is the property owner and TPG Architecture is the design firm of record. The project was registered with TDLR on August 13, 2024.
โFrequently Asked Questions
What is Capital One Cafe?
Capital One Cafe is a renovation/alteration project at 106 E 6th #100 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior improvements
Is Capital One Cafe open in Austin?
Construction on Capital One Cafe is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2024. The building is finished and very likely open.
Where is Capital One Cafe located?
Capital One Cafe is located at 106 E 6th #100, Austin, TX, 78701, in Travis County.
Who is the owner or developer of Capital One Cafe?
ECR is the property owner/developer of record for Capital One Cafe, per its TDLR project registration.
Who is the architect or design firm for Capital One Cafe?
TPG Architecture is the design firm of record for Capital One Cafe, according to its TDLR filing.
How much does Capital One Cafe cost and how big is it?
Capital One Cafe has an estimated construction value of $487K and approximately 4,200 square feet (about $116/sqft), based on its TDLR filing.
๐Scope of Work
Interior improvements
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Aug 13, 2024
Review Complete
Inspection Complete
Closed
Dec 30, 2024
๐Related Projects
๐คSame Owner
$927K total๐๏ธSame Design Firm
$3.0M total๐Related City Permits
Building permits found at or near this location
Express: Shower to shower replacement (prefab base) in the same location.
Express: Shower to shower replacement (prefab base) in the same location.
Remodel kitchen pantry and utility closet. Replace kitchen window. Pantry relocated to utility closet splitting existing pantry into coffee bar and living room closet.
Remodel kitchen pantry and utility closet. Replace kitchen window. Pantry relocated to utility closet splitting existing pantry into coffee bar and living room closet.
Replacement of an existing water heater