Goehring-BCP
Goehring-BCP is a renovation/alteration project at 3755 Capital of Texas Highway South Bldg. 1, Suite 200, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Mar 2026). The project has an estimated value of $1.3M across about 7,937 sq ft.
๐Project Metrics
TDLR #TABS2024025778Inspection Complete
Final inspection completed, awaiting project closure
Goehring-BCP is a Renovation/Alteration project located at 3755 Capital of Texas Highway South Bldg. 1, Suite 200, Austin, TX 78704 in Austin, Texas. The project has an estimated value of $1.3M covering 7,937 sq ft. BCP Building I, LLC is the property owner. The project was registered with TDLR on August 19, 2024.
โFrequently Asked Questions
What is Goehring-BCP?
Goehring-BCP is a renovation/alteration project at 3755 Capital of Texas Highway South Bldg. 1, Suite 200 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: tenant finish-out
Is Goehring-BCP open in Austin?
Construction on Goehring-BCP is complete โ TDLR records show the project passed its required accessibility inspection in Mar 2026. The building is finished and very likely open.
Where is Goehring-BCP located?
Goehring-BCP is located at 3755 Capital of Texas Highway South Bldg. 1, Suite 200, Austin, TX, 78704, in Travis County.
Who is the owner or developer of Goehring-BCP?
BCP Building I, LLC is the property owner/developer of record for Goehring-BCP, per its TDLR project registration.
How much does Goehring-BCP cost and how big is it?
Goehring-BCP has an estimated construction value of $1.3M and approximately 7,937 square feet (about $160/sqft), based on its TDLR filing.
๐Scope of Work
tenant finish-out
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Aug 19, 2024
Review Complete
Aug 19, 2024
Inspection Complete
Mar 31, 2026
Closed
589d
Construction phase
๐Related Projects
๐คSame Owner
$2.5M total๐Related City Permits
Building permits found at or near this location
Interior alteration of approx. (4528 SF) of existing interior space.
Interior alteration of approx. (4528 SF) of existing interior space.
Interior alteration of approx. (4528 SF) of existing interior space.
INTERIOR ALTERATION OF APPROX (743 SF) OF EXISTING INTERIOR SPACE to existing adm/bus/prof office
Interior alteration of approx. (4528 SF) of existing interior space.