Level Up Trading
Level Up Trading is a renovation/alteration project at 2219 E 8th St., Odessa, in Ector County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2024). The project has an estimated value of $98K across about 2,544 sq ft.
๐Project Metrics
TDLR #TABS2024026635Inspection Complete
Final inspection completed, awaiting project closure
Level Up Trading is a Renovation/Alteration project located at 2219 E 8th St., Odessa, TX 79761 in Odessa, Texas. The project has an estimated value of $98K covering 2,544 sq ft. Level Up Trading Inc is the property owner and Par II Designs is the design firm of record. The project was registered with TDLR on August 29, 2024.
โFrequently Asked Questions
What is Level Up Trading?
Level Up Trading is a renovation/alteration project at 2219 E 8th St. in Odessa, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior Build out 2544 SQ FT
Is Level Up Trading open in Odessa?
Construction on Level Up Trading is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2024. The building is finished and very likely open.
Where is Level Up Trading located?
Level Up Trading is located at 2219 E 8th St., Odessa, TX, 79761, in Ector County.
Who is the owner or developer of Level Up Trading?
Level Up Trading Inc is the property owner/developer of record for Level Up Trading, per its TDLR project registration.
Who is the architect or design firm for Level Up Trading?
Par II Designs is the design firm of record for Level Up Trading, according to its TDLR filing.
How much does Level Up Trading cost and how big is it?
Level Up Trading has an estimated construction value of $98K and approximately 2,544 square feet (about $39/sqft), based on its TDLR filing.
๐Scope of Work
Interior Build out 2544 SQ FT
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Aug 29, 2024
Review Complete
Inspection Complete
Dec 31, 2024
Closed