Speedy Stop 124
Speedy Stop 124 is a new construction project at 1019 HWY 35, Port Lavaca, in Calhoun County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $7.5M across about 6,800 sq ft.
๐Project Metrics
TDLR #TABS2025002551Review Complete
Design review complete, construction may proceed
Speedy Stop 124 is a New Construction project located at 1019 HWY 35, Port Lavaca, TX 77979 in Port Lavaca, Texas. The project has an estimated value of $7.5M covering 6,800 sq ft. Speedy Stop Food Stores, LLC is the property owner and Zemanek Architecture +Design, llc is the design firm of record. The project was registered with TDLR on October 4, 2024.
โFrequently Asked Questions
What is Speedy Stop 124?
Speedy Stop 124 is a new construction project at 1019 HWY 35 in Port Lavaca, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construction of a new convenience store and tunnel wash
Is Speedy Stop 124 open in Port Lavaca?
Speedy Stop 124 is currently under construction in Port Lavaca, TX. Its current TDLR status is "Review Complete".
Where is Speedy Stop 124 located?
Speedy Stop 124 is located at 1019 HWY 35, Port Lavaca, TX, 77979, in Calhoun County.
Who is the owner or developer of Speedy Stop 124?
Speedy Stop Food Stores, LLC is the property owner/developer of record for Speedy Stop 124, per its TDLR project registration.
Who is the architect or design firm for Speedy Stop 124?
Zemanek Architecture +Design, llc is the design firm of record for Speedy Stop 124, according to its TDLR filing.
How much does Speedy Stop 124 cost and how big is it?
Speedy Stop 124 has an estimated construction value of $7.5M and approximately 6,800 square feet (about $1.10K/sqft), based on its TDLR filing.
๐Scope of Work
Construction of a new convenience store and tunnel wash
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Oct 4, 2024
Review Complete
Oct 4, 2024
Inspection Complete
Closed
๐Related Projects
๐คSame Owner
$94.3M total๐๏ธSame Design Firm
$166.3M total๐Nearby Projects
Within 1 kmProperty Owner
Design Firm
Registered Accessibility Specialist
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Calhoun County
Find General Contractors in Calhoun