MULTI COOK
MULTI COOK is a renovation/alteration project at 251 N Bell Blvd Suite 101, Cedar Park, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $90K across about 1,360 sq ft.
๐Project Metrics
TDLR #TABS2025002631Review Complete
Design review complete, construction may proceed
MULTI COOK is a Renovation/Alteration project located at 251 N Bell Blvd Suite 101, Cedar Park, TX 78613 in Cedar Park, Texas. The project has an estimated value of $90K covering 1,360 sq ft. 251 WRB Holdings, LLC is the property owner and Kui-Mew Wong, Architect is the design firm of record. The project was registered with TDLR on October 7, 2024.
โFrequently Asked Questions
What is MULTI COOK?
MULTI COOK is a renovation/alteration project at 251 N Bell Blvd Suite 101 in Cedar Park, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior tenant finish-out remodeling of an existing retail space
Is MULTI COOK open in Cedar Park?
MULTI COOK is currently under construction in Cedar Park, TX. Its current TDLR status is "Review Complete".
Where is MULTI COOK located?
MULTI COOK is located at 251 N Bell Blvd Suite 101, Cedar Park, TX, 78613, in Williamson County.
Who is the owner or developer of MULTI COOK?
251 WRB Holdings, LLC is the property owner/developer of record for MULTI COOK, per its TDLR project registration.
Who is the architect or design firm for MULTI COOK?
Kui-Mew Wong, Architect is the design firm of record for MULTI COOK, according to its TDLR filing.
How much does MULTI COOK cost and how big is it?
MULTI COOK has an estimated construction value of $90K and approximately 1,360 square feet (about $66/sqft), based on its TDLR filing.
๐Scope of Work
Interior tenant finish-out remodeling of an existing retail space
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Oct 7, 2024
Review Complete
Oct 7, 2024
Inspection Complete
Closed
๐Related Projects
๐Related City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work
ePlan: Residential Expedited Review - New TWO UNIT RES. New construction of a 2-Story Single Family Res. [3bed 3.5bath]
New construction of a 2-Story Single Family Res. [1bed 1bath] with Attached Garage
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system without duct work for Unit 112
Demo old driveway. Construct new driveway approach of 16.25 FT