DFW Code 3 Reimagined
DFW Code 3 Reimagined is a renovation/alteration project at 2390 Innovation Drive, Dallas, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $3.0M across about 7,200 sq ft.
๐Project Metrics
TDLR #TABS2025002858Review Complete
Design review complete, construction may proceed
DFW Code 3 Reimagined is a Renovation/Alteration project located at 2390 Innovation Drive, Dallas, TX 76051 in Dallas, Texas. The project has an estimated value of $3.0M covering 7,200 sq ft. DFW Airport is the property owner. The project was registered with TDLR on October 9, 2024.
โFrequently Asked Questions
What is DFW Code 3 Reimagined?
DFW Code 3 Reimagined is a renovation/alteration project at 2390 Innovation Drive in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior Renovation andn roof replacement.
Is DFW Code 3 Reimagined open in Dallas?
DFW Code 3 Reimagined is currently under construction in Dallas, TX. Its current TDLR status is "Review Complete".
Where is DFW Code 3 Reimagined located?
DFW Code 3 Reimagined is located at 2390 Innovation Drive, Dallas, TX, 76051, in Tarrant County.
Who is the owner or developer of DFW Code 3 Reimagined?
DFW Airport is the property owner/developer of record for DFW Code 3 Reimagined, per its TDLR project registration.
How much does DFW Code 3 Reimagined cost and how big is it?
DFW Code 3 Reimagined has an estimated construction value of $3.0M and approximately 7,200 square feet (about $417/sqft), based on its TDLR filing.
๐Scope of Work
Interior Renovation andn roof replacement.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Oct 9, 2024
Review Complete
Oct 9, 2024
Inspection Complete
Closed