Abrielle LLC
Abrielle LLC is a new construction project at 11740 North US 183, Florence, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $60K across about 7,200 sq ft.
๐Project Metrics
TDLR #TABS2025003272Review Complete
Design review complete, construction may proceed
Abrielle LLC is a New Construction project located at 11740 North US 183, Florence, TX 76527 in Florence, Texas. The project has an estimated value of $60K covering 7,200 sq ft. Abrielle Miller is the property owner and Eckermann Engineering Inc is the design firm of record. The project was registered with TDLR on October 15, 2024.
โFrequently Asked Questions
What is Abrielle LLC?
Abrielle LLC is a new construction project at 11740 North US 183 in Florence, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Sidewalks and handicapped parking spaces
Is Abrielle LLC open in Florence?
Abrielle LLC is currently under construction in Florence, TX. Its current TDLR status is "Review Complete".
Where is Abrielle LLC located?
Abrielle LLC is located at 11740 North US 183, Florence, TX, 76527, in Williamson County.
Who is the owner or developer of Abrielle LLC?
Abrielle Miller is the property owner/developer of record for Abrielle LLC, per its TDLR project registration.
Who is the architect or design firm for Abrielle LLC?
Eckermann Engineering Inc is the design firm of record for Abrielle LLC, according to its TDLR filing.
How much does Abrielle LLC cost and how big is it?
Abrielle LLC has an estimated construction value of $60K and approximately 7,200 square feet (about $8/sqft), based on its TDLR filing.
๐Scope of Work
Sidewalks and handicapped parking spaces
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Oct 15, 2024
Review Complete
Oct 15, 2024
Inspection Complete
Closed
๐Related Projects
๐๏ธSame Design Firm
$64.0M total๐Related City Permits
Building permits found at or near this location
16ft tunnel to repair broken drain under foundation.
Replacement of complete existing central heat and air system with or without duct work Single stage 4 ton gas
Replacement of an existing water heater replacing the water heater with a tankless water heater
Transitioning from LP gas to natural gas in both buildings (Building 1 and Building 2)
Palomino - Install new 6.57kW rooftop solar system to existing residential only using backfed breaker. Upgrading MSP to 200amp Utility company - PEC
Property Owner
Design Firm
Registered Accessibility Specialist
Williamson County Economy
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Williamson County
Find General Contractors in Williamson