Plastics
๐Project Metrics
TDLR #TABS2025004125Review Complete
Design review complete, construction may proceed
๐Scope of Work
177236 SF Ground up and complete interior finish out of the EV manufacturing facility.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐Related City Permits
Building permits found at or near this location
New single-story unit (1br/1ba) with attached covered patio and uncovered wood deck
Replacement of an existing water heater Repalce a 50 gallon electric water heater
Interior Remodel: Bathroom remodel
Upgrading outdoor main electrical from 100a to 150a. Complete grounding system and surge protection with new range home run from outdoor panel to range as well smoke detector circuit.
Replace water line in the yard