Introba
Introba is a renovation/alteration project at 5601 Executive Drive Suite 320, Irving, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $126K across about 2,339 sq ft.
๐Project Metrics
TDLR #TABS2025005118Review Complete
Design review complete, construction may proceed
Introba is a Renovation/Alteration project located at 5601 Executive Drive Suite 320, Irving, TX 75038 in Irving, Texas. The project has an estimated value of $126K covering 2,339 sq ft. Novel Office is the property owner and Go Studio is the design firm of record. The project was registered with TDLR on November 7, 2024.
โFrequently Asked Questions
What is Introba?
Introba is a renovation/alteration project at 5601 Executive Drive Suite 320 in Irving, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior renovation of existing office space in a high rise building.
Is Introba open in Irving?
Introba is currently under construction in Irving, TX. Its current TDLR status is "Review Complete".
Where is Introba located?
Introba is located at 5601 Executive Drive Suite 320, Irving, TX, 75038, in Dallas County.
Who is the owner or developer of Introba?
Novel Office is the property owner/developer of record for Introba, per its TDLR project registration.
Who is the architect or design firm for Introba?
Go Studio is the design firm of record for Introba, according to its TDLR filing.
How much does Introba cost and how big is it?
Introba has an estimated construction value of $126K and approximately 2,339 square feet (about $54/sqft), based on its TDLR filing.
๐Scope of Work
Interior renovation of existing office space in a high rise building.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Nov 7, 2024
Review Complete
Nov 7, 2024
Inspection Complete
Closed