1009 S Austin Ave
1009 S Austin Ave is a renovation/alteration project at 1009 South Austin Avenue, Georgetown, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $105K across about 1,826 sq ft.
๐Project Metrics
TDLR #TABS2025005480Review Complete
Design review complete, construction may proceed
1009 S Austin Ave is a Renovation/Alteration project located at 1009 South Austin Avenue, Georgetown, TX 78626 in Georgetown, Texas. The project has an estimated value of $105K covering 1,826 sq ft. Jack Brown Family III LP is the property owner. The project was registered with TDLR on November 13, 2024.
โFrequently Asked Questions
What is 1009 S Austin Ave?
1009 S Austin Ave is a renovation/alteration project at 1009 South Austin Avenue in Georgetown, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior remodel of existing commercial space. No exterior or structural modifications will be made.
Is 1009 S Austin Ave open in Georgetown?
1009 S Austin Ave is currently under construction in Georgetown, TX. Its current TDLR status is "Review Complete".
Where is 1009 S Austin Ave located?
1009 S Austin Ave is located at 1009 South Austin Avenue, Georgetown, TX, 78626, in Williamson County.
Who is the owner or developer of 1009 S Austin Ave?
Jack Brown Family III LP is the property owner/developer of record for 1009 S Austin Ave, per its TDLR project registration.
How much does 1009 S Austin Ave cost and how big is it?
1009 S Austin Ave has an estimated construction value of $105K and approximately 1,826 square feet (about $58/sqft), based on its TDLR filing.
๐Scope of Work
Interior remodel of existing commercial space. No exterior or structural modifications will be made.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Nov 13, 2024
Review Complete
Jun 20, 2026
Inspection Complete
Closed
๐Related Projects
๐คSame Owner
$3.9M total๐Related City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work HVAC Change out only
Replacement of condenser only
Remodel/TI to add two cooler doors concrete pads outside the doors and modify existing fence to include new door. Remodel/TI of the existing Drivers Check In Room and Office with additional power and lockers
Remodel/TI to add two cooler doors concrete pads outside the doors and modify existing fence to include new door. Remodel/TI of the existing Drivers Check In Room and Office with additional power and lockers **EP Created in error - AP 5/29/26**
Add AC units to existing ESFR Sprinklered Warehouse