5300 Lohman Ford Road
5300 Lohman Ford Road is a new construction project at 5300 Lohman Ford Road, Lago Vista, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $2.5M across about 59,201 sq ft.
๐Project Metrics
TDLR #TABS2025008324Review Complete
Design review complete, construction may proceed
5300 Lohman Ford Road is a New Construction project located at 5300 Lohman Ford Road, Lago Vista, TX 78613 in Lago Vista, Texas. The project has an estimated value of $2.5M covering 59,201 sq ft. John Muhich is the property owner. The project was registered with TDLR on December 20, 2024.
โFrequently Asked Questions
What is 5300 Lohman Ford Road?
5300 Lohman Ford Road is a new construction project at 5300 Lohman Ford Road in Lago Vista, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New Industrial Warehouse space. Existing private residence will remain. New drives and water quality / detention pond.
Is 5300 Lohman Ford Road open in Lago Vista?
5300 Lohman Ford Road is currently under construction in Lago Vista, TX. Its current TDLR status is "Review Complete".
Where is 5300 Lohman Ford Road located?
5300 Lohman Ford Road is located at 5300 Lohman Ford Road, Lago Vista, TX, 78613, in Travis County.
Who is the owner or developer of 5300 Lohman Ford Road?
John Muhich is the property owner/developer of record for 5300 Lohman Ford Road, per its TDLR project registration.
How much does 5300 Lohman Ford Road cost and how big is it?
5300 Lohman Ford Road has an estimated construction value of $2.5M and approximately 59,201 square feet (about $42/sqft), based on its TDLR filing.
๐Scope of Work
New Industrial Warehouse space. Existing private residence will remain. New drives and water quality / detention pond.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Dec 20, 2024
Review Complete
Dec 20, 2024
Inspection Complete
Closed
๐Related Projects
๐คSame Owner
$9.3M total๐Related City Permits
Building permits found at or near this location
Replacement of an existing water heater Change Out: Install/ Replace 50 gallon electric tank-type water heater.
Replacement of an existing water heater Navien 210A Tankless water Heater Location: Garage
Interior Remodel (Kitchen remodel with plumbing and electrical relocation and underground trenching window and door replacement new exterior sliding glass door) Conversion of an office into a bedroom by constructing a new interior wall and replacing the existing window to meet egress requirements.
Interior Remodel (Kitchen remodel with plumbing and electrical relocation and underground trenching window and door replacement new exterior sliding glass door) Conversion of an office into a bedroom by constructing a new interior wall and replacing the existing window to meet egress requirements.
TPO single ply recover. Remove existing TPO membrane install new 1/2 hd cover board rhino bond new80 mil membrane
Property Owner
Registered Accessibility Specialist
Travis County Economy
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Travis County
Find General Contractors in Travis