8200 Springwood, Ste 230-235 is a renovation/alteration project at 8200 Springwood Dr, Irving, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2026). The project has an estimated value of $91K across about 7,113 sq ft.
Final inspection completed, awaiting project closure
8200 Springwood, Ste 230-235 is a Renovation/Alteration project located at 8200 Springwood Dr, Irving, TX 75063 in Irving, Texas. The project has an estimated value of $91K covering 7,113 sq ft. SPRINGWOOD EPA LLC is the property owner and idGROUP is the design firm of record. The project was registered with TDLR on December 20, 2024.
8200 Springwood, Ste 230-235 is a renovation/alteration project at 8200 Springwood Dr in Irving, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Separation of an existing suite, with interior finish out and returning space back to warehouse
Construction on 8200 Springwood, Ste 230-235 is complete โ TDLR records show the project passed its required accessibility inspection in May 2026. The building is finished and very likely open.
8200 Springwood, Ste 230-235 is located at 8200 Springwood Dr, Irving, TX, 75063, in Dallas County.
SPRINGWOOD EPA LLC is the property owner/developer of record for 8200 Springwood, Ste 230-235, per its TDLR project registration.
idGROUP is the design firm of record for 8200 Springwood, Ste 230-235, according to its TDLR filing.
8200 Springwood, Ste 230-235 has an estimated construction value of $91K and approximately 7,113 square feet (about $13/sqft), based on its TDLR filing.
Separation of an existing suite, with interior finish out and returning space back to warehouse
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Dec 20, 2024
Review Complete
Dec 20, 2024
Inspection Complete
May 1, 2026
Closed
497d
Construction phase