EPIA Dust Off By Pass D B
EPIA Dust Off By Pass D B is a new construction project at Bypass between Constitution Ave and Iron Dust Dr, El Paso, in El Paso County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $4.2M across about 104,805 sq ft.
๐Project Metrics
TDLR #TABS2025009054Review Complete
Design review complete, construction may proceed
EPIA Dust Off By Pass D B is a New Construction project located at Bypass between Constitution Ave and Iron Dust Dr, El Paso, TX 79925 in El Paso, Texas. The project has an estimated value of $4.2M covering 104,805 sq ft. City of El Paso is the property owner and Parkhill is the design firm of record. The project was registered with TDLR on January 8, 2025.
โFrequently Asked Questions
What is EPIA Dust Off By Pass D B?
EPIA Dust Off By Pass D B is a new construction project at Bypass between Constitution Ave and Iron Dust Dr in El Paso, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Scope includes an approximate 1,500-foot-long road (104,805 SF) bypass between Constitution Avenue and Iron Dust Drive, ADA compliant sidewalks, curb and gutter, illumination, and landscaped median.
Is EPIA Dust Off By Pass D B open in El Paso?
EPIA Dust Off By Pass D B is currently under construction in El Paso, TX. Its current TDLR status is "Review Complete".
Where is EPIA Dust Off By Pass D B located?
EPIA Dust Off By Pass D B is located at Bypass between Constitution Ave and Iron Dust Dr, El Paso, TX, 79925, in El Paso County.
Who is the owner or developer of EPIA Dust Off By Pass D B?
City of El Paso is the property owner/developer of record for EPIA Dust Off By Pass D B, per its TDLR project registration.
Who is the architect or design firm for EPIA Dust Off By Pass D B?
Parkhill is the design firm of record for EPIA Dust Off By Pass D B, according to its TDLR filing.
How much does EPIA Dust Off By Pass D B cost and how big is it?
EPIA Dust Off By Pass D B has an estimated construction value of $4.2M and approximately 104,805 square feet (about $40/sqft), based on its TDLR filing.
๐Scope of Work
Scope includes an approximate 1,500-foot-long road (104,805 SF) bypass between Constitution Avenue and Iron Dust Drive, ADA compliant sidewalks, curb and gutter, illumination, and landscaped median.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jan 8, 2025
Review Complete
Jan 8, 2025
Inspection Complete
Closed
๐Related Projects
๐คSame Owner
$1.31B totalProperty Owner
Design Firm
Registered Accessibility Specialist
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in El Paso County
Find General Contractors in El Paso