Cath Lab
Cath Lab is a renovation/alteration project at 11212 TX-151, San Antonio, in Bexar County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $3.9M across about 493 sq ft.
๐Project Metrics
TDLR #TABS2025009695Review Complete
Design review complete, construction may proceed
Cath Lab is a Renovation/Alteration project located at 11212 TX-151, San Antonio, TX 78251 in San Antonio, Texas. The project has an estimated value of $3.9M covering 493 sq ft. Christus Santa Rosa Hospital is the property owner and LK Design Group Inc. is the design firm of record. The project was registered with TDLR on January 16, 2025.
โFrequently Asked Questions
What is Cath Lab?
Cath Lab is a renovation/alteration project at 11212 TX-151 in San Antonio, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Equipment replacement
Is Cath Lab open in San Antonio?
Cath Lab is currently under construction in San Antonio, TX. Its current TDLR status is "Review Complete".
Where is Cath Lab located?
Cath Lab is located at 11212 TX-151, San Antonio, TX, 78251, in Bexar County.
Who is the owner or developer of Cath Lab?
Christus Santa Rosa Hospital is the property owner/developer of record for Cath Lab, per its TDLR project registration.
Who is the architect or design firm for Cath Lab?
LK Design Group Inc. is the design firm of record for Cath Lab, according to its TDLR filing.
How much does Cath Lab cost and how big is it?
Cath Lab has an estimated construction value of $3.9M and approximately 493 square feet (about $7.97K/sqft), based on its TDLR filing.
๐Scope of Work
Equipment replacement
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jan 16, 2025
Review Complete
Jan 16, 2025
Inspection Complete
Closed