LPC Office Finish Out
LPC Office Finish Out is a new construction project at 401 W 4th St. Suite 1900, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2026). The project has an estimated value of $1.5M across about 6,025 sq ft.
๐Project Metrics
TDLR #TABS2025010174Inspection Complete
Final inspection completed, awaiting project closure
LPC Office Finish Out is a New Construction project located at 401 W 4th St. Suite 1900, Austin, TX 78751 in Austin, Texas. The project has an estimated value of $1.5M covering 6,025 sq ft. Lincoln Property Company is the property owner and Michael Hsu Office of Architecture is the design firm of record. The project was registered with TDLR on January 23, 2025.
โFrequently Asked Questions
What is LPC Office Finish Out?
LPC Office Finish Out is a new construction project at 401 W 4th St. Suite 1900 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 6,025SF interior finish out in an existing building on level 19
Is LPC Office Finish Out open in Austin?
Construction on LPC Office Finish Out is complete โ TDLR records show the project passed its required accessibility inspection in Jun 2026. The building is finished and very likely open.
Where is LPC Office Finish Out located?
LPC Office Finish Out is located at 401 W 4th St. Suite 1900, Austin, TX, 78751, in Travis County.
Who is the owner or developer of LPC Office Finish Out?
Lincoln Property Company is the property owner/developer of record for LPC Office Finish Out, per its TDLR project registration.
Who is the architect or design firm for LPC Office Finish Out?
Michael Hsu Office of Architecture is the design firm of record for LPC Office Finish Out, according to its TDLR filing.
How much does LPC Office Finish Out cost and how big is it?
LPC Office Finish Out has an estimated construction value of $1.5M and approximately 6,025 square feet (about $249/sqft), based on its TDLR filing.
๐Scope of Work
6,025SF interior finish out in an existing building on level 19
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jan 23, 2025
Review Complete
Jan 23, 2025
Inspection Complete
Jun 30, 2026
Closed
523d
Construction phase
๐Related Projects
๐คSame Owner
$1.28B total๐๏ธSame Design Firm
$460.1M total๐Related City Permits
Building permits found at or near this location
100amp interior and exterior panel replacement. no meter work done. Austin energy is the provider
Remodel kitchen by replacing cabinets and counters window over sink and removing 1 interior kitchen wall to expand the kitchen. In the master bathroom replace the tub and shower. On the stairs replace the treads and railing. For remainder of house replace flooring trim around fireplace and paint. Install new recessed can lights in kitchen living room foyer closet/pantry and bathroom.
Installation of new generac generator and service rated automatic transfer switch. Austin Energy disconnect will be needed. (Sandra Farris Ealey)
TENANT FINISH OUT - LAW OFFICES
Replacement of complete existing central heat and air system with or without duct work
Property Owner
Design Firm
Registered Accessibility Specialist
Tenant
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Travis County
Find General Contractors in Travis