MDACC ITM Package B is a renovation/alteration project at 1515 Holcombe Ave, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2026). The project has an estimated value of $2.8M across about 10,200 sq ft.
Final inspection completed, awaiting project closure
MDACC ITM Package B is a Renovation/Alteration project located at 1515 Holcombe Ave, Houston, TX 77030 in Houston, Texas. The project has an estimated value of $2.8M covering 10,200 sq ft. Board of Regents-University of Texas is the property owner and Stantec Architecture Inc. is the design firm of record. The project was registered with TDLR on January 24, 2025.
MDACC ITM Package B is a renovation/alteration project at 1515 Holcombe Ave in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovations to multiple lab spaces within multiple buildings of the MDACC main campus.
Construction on MDACC ITM Package B is complete โ TDLR records show the project passed its required accessibility inspection in Jun 2026. The building is finished and very likely open.
MDACC ITM Package B is located at 1515 Holcombe Ave, Houston, TX, 77030, in Harris County.
Board of Regents-University of Texas is the property owner/developer of record for MDACC ITM Package B, per its TDLR project registration.
Stantec Architecture Inc. is the design firm of record for MDACC ITM Package B, according to its TDLR filing.
MDACC ITM Package B has an estimated construction value of $2.8M and approximately 10,200 square feet (about $272/sqft), based on its TDLR filing.
Renovations to multiple lab spaces within multiple buildings of the MDACC main campus.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Jan 24, 2025
Review Complete
Jan 24, 2025
Inspection Complete
Jun 20, 2026
Closed
512d
Construction phase