Burleson Crossing East - Phase I is a new construction project at 655 W SH 71, Ste. 101, Bastrop, in Bastrop County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2026). The project has an estimated value of $6.0M across about 23,349 sq ft.
Final inspection completed, awaiting project closure
Burleson Crossing East - Phase I is a New Construction project located at 655 W SH 71, Ste. 101, Bastrop, TX 78602 in Bastrop, Texas. The project has an estimated value of $6.0M covering 23,349 sq ft. BRP East Phase I, LLC is the property owner and Cuhaci Peterson is the design firm of record. The project was registered with TDLR on January 28, 2025.
Burleson Crossing East - Phase I is a new construction project at 655 W SH 71, Ste. 101 in Bastrop, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Build new building for Sprouts, 23,349 sf.
Construction on Burleson Crossing East - Phase I is complete โ TDLR records show the project passed its required accessibility inspection in Jan 2026. The building is finished and very likely open.
Burleson Crossing East - Phase I is located at 655 W SH 71, Ste. 101, Bastrop, TX, 78602, in Bastrop County.
BRP East Phase I, LLC is the property owner/developer of record for Burleson Crossing East - Phase I, per its TDLR project registration.
Cuhaci Peterson is the design firm of record for Burleson Crossing East - Phase I, according to its TDLR filing.
Burleson Crossing East - Phase I has an estimated construction value of $6.0M and approximately 23,349 square feet (about $257/sqft), based on its TDLR filing.
Build new building for Sprouts, 23,349 sf.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Jan 28, 2025
Review Complete
Jan 28, 2025
Inspection Complete
Jan 29, 2026
Closed
366d
Construction phase
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work Removed the old unit and installed 1 new HVAC system without ductwork
Replacement of complete existing central heat and air system with or without duct work
Express - Replace windows like for like
Gas pipe install for home generator
Installation of new 18KW permanent whole home generator (Natural Gas) connected to house meter and main panel. No meter can required.