Optum
Optum is a renovation/alteration project at 301 Seton Pkwy, Ste 100, Round Rock, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2025). The project has an estimated value of $200K across about 3,638 sq ft.
๐Project Metrics
TDLR #TABS2025010622Project Closed
Project has been completed and closed
Optum is a Renovation/Alteration project located at 301 Seton Pkwy, Ste 100, Round Rock, TX 78665 in Round Rock, Texas. The project has an estimated value of $200K covering 3,638 sq ft. LHPT Ascension Round Rock, LP is the property owner and Red Design Studios is the design firm of record. The project was registered with TDLR on January 29, 2025.
โFrequently Asked Questions
What is Optum?
Optum is a renovation/alteration project at 301 Seton Pkwy, Ste 100 in Round Rock, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: interior remodel for medical office
Is Optum open in Round Rock?
Construction on Optum is complete โ TDLR records show the project passed its required accessibility inspection in Jan 2025. The building is finished and very likely open.
Where is Optum located?
Optum is located at 301 Seton Pkwy, Ste 100, Round Rock, TX, 78665, in Williamson County.
Who is the owner or developer of Optum?
LHPT Ascension Round Rock, LP is the property owner/developer of record for Optum, per its TDLR project registration.
Who is the architect or design firm for Optum?
Red Design Studios is the design firm of record for Optum, according to its TDLR filing.
How much does Optum cost and how big is it?
Optum has an estimated construction value of $200K and approximately 3,638 square feet (about $55/sqft), based on its TDLR filing.
๐Scope of Work
interior remodel for medical office
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jan 29, 2025
Review Complete
Inspection Complete
Closed
Jan 29, 2025
๐Related Projects
๐๏ธSame Design Firm
$52.7M total๐Related City Permits
Building permits found at or near this location
Primary bathroom guest bathroom and powder bathroom renovations including electrical fixtures and flooring throughout the unit. No structural or exterior work is proposed- Suite 5402
TPO overlay over existing metal r-panel roof to include new metal trim gutters and downspouts. Existing auto parts store.
Replacement of complete existing central heat and air system with or without duct work
Construct new driveway approach of 8 FT. Driveway approach is from the alley.
Construct new driveway approach of 12 FT. No sidewalk inspection per plan review.