HteaO is a new construction project at 2126 Rufe Snow Dr, Keller, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2026). The project has an estimated value of $1.1M across about 2,522 sq ft.
๐Project Metrics
TDLR #TABS2025010790Project Closed
Project has been completed and closed
HteaO is a New Construction project located at 2126 Rufe Snow Dr, Keller, TX 76248 in Keller, Texas. The project has an estimated value of $1.1M covering 2,522 sq ft. Jonathan Lovelace is the property owner and Rose-Villacorte Architecture LLC is the design firm of record. The project was registered with TDLR on January 31, 2025.
โFrequently Asked Questions
What is HteaO?
HteaO is a new construction project at 2126 Rufe Snow Dr in Keller, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 2,552 S.F. Scope: brewers, R.O. Water sys, cooler, prep, store, spaces for dry & prepackaged food
Is HteaO open in Keller?
Construction on HteaO is complete โ TDLR records show the project passed its required accessibility inspection in Jan 2026. The building is finished and very likely open.
Where is HteaO located?
HteaO is located at 2126 Rufe Snow Dr, Keller, TX, 76248, in Tarrant County.
Who is the owner or developer of HteaO?
Jonathan Lovelace is the property owner/developer of record for HteaO, per its TDLR project registration.
Who is the architect or design firm for HteaO?
Rose-Villacorte Architecture LLC is the design firm of record for HteaO, according to its TDLR filing.
How much does HteaO cost and how big is it?
HteaO has an estimated construction value of $1.1M and approximately 2,522 square feet (about $436/sqft), based on its TDLR filing.
๐Scope of Work
2,552 S.F. Scope: brewers, R.O. Water sys, cooler, prep, store, spaces for dry & prepackaged food
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jan 31, 2025
Review Complete
Inspection Complete
Jan 31, 2025
Closed
Jan 27, 2026
๐Related Projects
๐๏ธSame Design Firm
$38.9M totalProperty Owner
Design Firm
Registered Accessibility Specialist
Tarrant County Economy
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Tarrant County
Find General Contractors in Tarrant