JMT Engineering
JMT Engineering is a renovation/alteration project at 2600 Via Fortune Suite 575, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Feb 2025). The project has an estimated value of $362K across about 3,660 sq ft.
๐Project Metrics
TDLR #TABS2025011342Project Closed
Project has been completed and closed
JMT Engineering is a Renovation/Alteration project located at 2600 Via Fortune Suite 575, Austin, TX 78746 in Austin, Texas. The project has an estimated value of $362K covering 3,660 sq ft. Cousins Properties is the property owner and STG Design is the design firm of record. The project was registered with TDLR on February 7, 2025.
โFrequently Asked Questions
What is JMT Engineering?
JMT Engineering is a renovation/alteration project at 2600 Via Fortune Suite 575 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior finish out, new offices, new plumbing in Break Room, Conference and work room
Is JMT Engineering open in Austin?
Construction on JMT Engineering is complete โ TDLR records show the project passed its required accessibility inspection in Feb 2025. The building is finished and very likely open.
Where is JMT Engineering located?
JMT Engineering is located at 2600 Via Fortune Suite 575, Austin, TX, 78746, in Travis County.
Who is the owner or developer of JMT Engineering?
Cousins Properties is the property owner/developer of record for JMT Engineering, per its TDLR project registration.
Who is the architect or design firm for JMT Engineering?
STG Design is the design firm of record for JMT Engineering, according to its TDLR filing.
How much does JMT Engineering cost and how big is it?
JMT Engineering has an estimated construction value of $362K and approximately 3,660 square feet (about $99/sqft), based on its TDLR filing.
๐Scope of Work
Interior finish out, new offices, new plumbing in Break Room, Conference and work room
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Feb 7, 2025
Review Complete
Inspection Complete
Closed
Feb 7, 2025
๐Related Projects
๐คSame Owner
$581.2M total๐๏ธSame Design Firm
$4.94B total๐Related City Permits
Building permits found at or near this location
Interior finish out of an existing office space for Suite 260 7 day review.
Interior finish out of an existing office space for Suite 260 7 day review.
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Existing 200 amp underground service is having problems and needs to be replaced. AE disconnect will be needed.