GHS SUITE 210 FINISHOUT is a renovation/alteration project at 624 Austin Ave, Suite 210 Suite 104, Georgetown, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Feb 2026). The project has an estimated value of $250K across about 3,580 sq ft.
Project has been completed and closed
GHS SUITE 210 FINISHOUT is a Renovation/Alteration project located at 624 Austin Ave, Suite 210 Suite 104, Georgetown, TX 78628 in Georgetown, Texas. The project has an estimated value of $250K covering 3,580 sq ft. Georgetown Healthcare System/Scott Alercon is the property owner and Elsasser Architectural Inc is the design firm of record. The project was registered with TDLR on February 26, 2025.
GHS SUITE 210 FINISHOUT is a renovation/alteration project at 624 Austin Ave, Suite 210 Suite 104 in Georgetown, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Tenant finishout consisting of 10 offices. conference room, break room and reception area.
Construction on GHS SUITE 210 FINISHOUT is complete โ TDLR records show the project passed its required accessibility inspection in Feb 2026. The building is finished and very likely open.
GHS SUITE 210 FINISHOUT is located at 624 Austin Ave, Suite 210 Suite 104, Georgetown, TX, 78628, in Williamson County.
Georgetown Healthcare System/Scott Alercon is the property owner/developer of record for GHS SUITE 210 FINISHOUT, per its TDLR project registration.
Elsasser Architectural Inc is the design firm of record for GHS SUITE 210 FINISHOUT, according to its TDLR filing.
GHS SUITE 210 FINISHOUT has an estimated construction value of $250K and approximately 3,580 square feet (about $70/sqft), based on its TDLR filing.
Tenant finishout consisting of 10 offices. conference room, break room and reception area.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Feb 26, 2025
Review Complete
Feb 26, 2025
Inspection Complete
Dec 6, 2025
Closed
Feb 24, 2026
283d
Construction phase
Building permits found at or near this location
***Emergency service replacement done on 2/24/26. ESPA is required-Hyatt*** A truck hit the service riser this will be an emergency repair.
ADDITION NEW TAKE
REMODEL TO EXISTING RESTAURANT (BLDG 1 AND 2 )
ADDITION NEW TAKE OUT
Replacement of complete existing central heat and air system with or without duct work