Origin Bank Suite 100
Origin Bank Suite 100 is a renovation/alteration project at 2245 Texas Drive Suite 100, Sugar Land, in Fort Bend County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2026). The project has an estimated value of $275K across about 3,684 sq ft.
๐Project Metrics
TDLR #TABS2025013976Inspection Complete
Final inspection completed, awaiting project closure
Origin Bank Suite 100 is a Renovation/Alteration project located at 2245 Texas Drive Suite 100, Sugar Land, TX 77479 in Sugar Land, Texas. The project has an estimated value of $275K covering 3,684 sq ft. LCFRE Sugar Land Town Square LLC is the property owner and Ziegler Cooper Architects is the design firm of record. The project was registered with TDLR on March 12, 2025.
โFrequently Asked Questions
What is Origin Bank Suite 100?
Origin Bank Suite 100 is a renovation/alteration project at 2245 Texas Drive Suite 100 in Sugar Land, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Office space remodel.
Is Origin Bank Suite 100 open in Sugar Land?
Construction on Origin Bank Suite 100 is complete โ TDLR records show the project passed its required accessibility inspection in Jun 2026. The building is finished and very likely open.
Where is Origin Bank Suite 100 located?
Origin Bank Suite 100 is located at 2245 Texas Drive Suite 100, Sugar Land, TX, 77479, in Fort Bend County.
Who is the owner or developer of Origin Bank Suite 100?
LCFRE Sugar Land Town Square LLC is the property owner/developer of record for Origin Bank Suite 100, per its TDLR project registration.
Who is the architect or design firm for Origin Bank Suite 100?
Ziegler Cooper Architects is the design firm of record for Origin Bank Suite 100, according to its TDLR filing.
How much does Origin Bank Suite 100 cost and how big is it?
Origin Bank Suite 100 has an estimated construction value of $275K and approximately 3,684 square feet (about $75/sqft), based on its TDLR filing.
๐Scope of Work
Office space remodel.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Mar 12, 2025
Review Complete
Mar 12, 2025
Inspection Complete
Jun 20, 2026
Closed
465d
Construction phase