COPA Transit Bus Pads #3
COPA Transit Bus Pads #3 is a renovation/alteration project at rights-of way throughout, Port Arthur, Teaxas, Port Arthur, in Jefferson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Mar 2025). The project has an estimated value of $200K across about 2,100 sq ft.
๐Project Metrics
TDLR #TABS2025014134Project Closed
Project has been completed and closed
COPA Transit Bus Pads #3 is a Renovation/Alteration project located at rights-of way throughout, Port Arthur, Teaxas, Port Arthur, TX 77640 in Port Arthur, Texas. The project has an estimated value of $200K covering 2,100 sq ft. City of Port Arthur is the property owner and Soutex is the design firm of record. The project was registered with TDLR on March 13, 2025.
โFrequently Asked Questions
What is COPA Transit Bus Pads #3?
COPA Transit Bus Pads #3 is a renovation/alteration project at rights-of way throughout, Port Arthur, Teaxas in Port Arthur, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Installation of bus pads in developed public right-of-way. Some pad sites will be removed/replaced and some new. Some pads will tie into existing sidewalk/ramps and some will be new, Design follows PROWAG as required- federally funded
Is COPA Transit Bus Pads #3 open in Port Arthur?
Construction on COPA Transit Bus Pads #3 is complete โ TDLR records show the project passed its required accessibility inspection in Mar 2025. The building is finished and very likely open.
Where is COPA Transit Bus Pads #3 located?
COPA Transit Bus Pads #3 is located at rights-of way throughout, Port Arthur, Teaxas, Port Arthur, TX, 77640, in Jefferson County.
Who is the owner or developer of COPA Transit Bus Pads #3?
City of Port Arthur is the property owner/developer of record for COPA Transit Bus Pads #3, per its TDLR project registration.
Who is the architect or design firm for COPA Transit Bus Pads #3?
Soutex is the design firm of record for COPA Transit Bus Pads #3, according to its TDLR filing.
How much does COPA Transit Bus Pads #3 cost and how big is it?
COPA Transit Bus Pads #3 has an estimated construction value of $200K and approximately 2,100 square feet (about $95/sqft), based on its TDLR filing.
๐Scope of Work
Installation of bus pads in developed public right-of-way. Some pad sites will be removed/replaced and some new. Some pads will tie into existing sidewalk/ramps and some will be new, Design follows PROWAG as required- federally funded
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Mar 13, 2025
Review Complete
Inspection Complete
Closed
Mar 13, 2025