OMC 2025
OMC 2025 is a new construction project at 10500 SeaWorld Dr, San Antonio, in Bexar County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2026). The project has an estimated value of $2.0M across about 1,966 sq ft.
๐Project Metrics
TDLR #TABS2025015465Inspection Complete
Final inspection completed, awaiting project closure
OMC 2025 is a New Construction project located at 10500 SeaWorld Dr, San Antonio, TX 78251 in San Antonio, Texas. The project has an estimated value of $2.0M covering 1,966 sq ft. Sea World of Texas, Inc. is the property owner and Sol Studio Architects, LLC is the design firm of record. The project was registered with TDLR on March 31, 2025.
โFrequently Asked Questions
What is OMC 2025?
OMC 2025 is a new construction project at 10500 SeaWorld Dr in San Antonio, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: OMC 2025
Is OMC 2025 open in San Antonio?
Construction on OMC 2025 is complete โ TDLR records show the project passed its required accessibility inspection in Apr 2026. The building is finished and very likely open.
Where is OMC 2025 located?
OMC 2025 is located at 10500 SeaWorld Dr, San Antonio, TX, 78251, in Bexar County.
Who is the owner or developer of OMC 2025?
Sea World of Texas, Inc. is the property owner/developer of record for OMC 2025, per its TDLR project registration.
Who is the architect or design firm for OMC 2025?
Sol Studio Architects, LLC is the design firm of record for OMC 2025, according to its TDLR filing.
How much does OMC 2025 cost and how big is it?
OMC 2025 has an estimated construction value of $2.0M and approximately 1,966 square feet (about $1.02K/sqft), based on its TDLR filing.
๐Scope of Work
OMC 2025
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Mar 31, 2025
Review Complete
Mar 31, 2025
Inspection Complete
Apr 16, 2026
Closed
381d
Construction phase
๐Related Projects
๐คSame Owner
$46.6M total๐๏ธSame Design Firm
$43.6M totalProperty Owner
Design Firm
Registered Accessibility Specialist
Bexar County Economy
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Bexar County
Find General Contractors in Bexar