Shoe Palace is a renovation/alteration project at 3880 IRVING MALL SPACES F02-03, Irving, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2025). The project has an estimated value of $240K across about 4,929 sq ft.
Final inspection completed, awaiting project closure
Shoe Palace is a Renovation/Alteration project located at 3880 IRVING MALL SPACES F02-03, Irving, TX 75062 in Irving, Texas. The project has an estimated value of $240K covering 4,929 sq ft. WPG is the property owner and Quorum Architects is the design firm of record. The project was registered with TDLR on April 9, 2025.
Shoe Palace is a renovation/alteration project at 3880 IRVING MALL SPACES F02-03 in Irving, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Remodel of an existing 4,929 SF retail space for Shoe Palace Corporation. New Walls, storefront remodel, mechanical, electrical, and plumbing.
Construction on Shoe Palace is complete โ TDLR records show the project passed its required accessibility inspection in Apr 2025. The building is finished and very likely open.
Shoe Palace is located at 3880 IRVING MALL SPACES F02-03, Irving, TX, 75062, in Tarrant County.
WPG is the property owner/developer of record for Shoe Palace, per its TDLR project registration.
Quorum Architects is the design firm of record for Shoe Palace, according to its TDLR filing.
Shoe Palace has an estimated construction value of $240K and approximately 4,929 square feet (about $49/sqft), based on its TDLR filing.
Remodel of an existing 4,929 SF retail space for Shoe Palace Corporation. New Walls, storefront remodel, mechanical, electrical, and plumbing.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Apr 9, 2025
Review Complete
Inspection Complete
Apr 9, 2025
Closed