D.W.T. Inc.
D.W.T. Inc. is a additions to existing building project at 19994 HICKORY TWIG WAY, Spring, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $105K across about 5,224 sq ft.
๐Project Metrics
TDLR #TABS2025016608Review Complete
Design review complete, construction may proceed
D.W.T. Inc. is a Additions to Existing Building project located at 19994 HICKORY TWIG WAY, Spring, TX 77388 in Spring, Texas. The project has an estimated value of $105K covering 5,224 sq ft. Dorstener Strategic Products LLP is the property owner and H4 Architects & Engineers is the design firm of record. The project was registered with TDLR on April 14, 2025.
โFrequently Asked Questions
What is D.W.T. Inc.?
D.W.T. Inc. is a additions to existing building project at 19994 HICKORY TWIG WAY in Spring, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Building Addition to Existing Factory Building
Is D.W.T. Inc. open in Spring?
D.W.T. Inc. is currently under construction in Spring, TX. Its current TDLR status is "Review Complete".
Where is D.W.T. Inc. located?
D.W.T. Inc. is located at 19994 HICKORY TWIG WAY, Spring, TX, 77388, in Harris County.
Who is the owner or developer of D.W.T. Inc.?
Dorstener Strategic Products LLP is the property owner/developer of record for D.W.T. Inc., per its TDLR project registration.
Who is the architect or design firm for D.W.T. Inc.?
H4 Architects & Engineers is the design firm of record for D.W.T. Inc., according to its TDLR filing.
How much does D.W.T. Inc. cost and how big is it?
D.W.T. Inc. has an estimated construction value of $105K and approximately 5,224 square feet (about $20/sqft), based on its TDLR filing.
๐Scope of Work
Building Addition to Existing Factory Building
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Apr 14, 2025
Review Complete
Apr 14, 2025
Inspection Complete
Closed