Under construction๐Ÿ“Review Complete๐Ÿ”ง Renovation/Alteration๐Ÿ’ต This project involves public funds, public land, or is a Federally funded roadway project.

Al Rollins Neighborhood Park Phase 1

3311 SW GREEN OAKS BLVD, Arlington, TX 76017, Arlington, TX, 76017

Al Rollins Neighborhood Park Phase 1 is a renovation/alteration project at 3311 SW GREEN OAKS BLVD, Arlington, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $1.2M across about 58,800 sq ft.

Construction50%

๐Ÿ“ŠProject Metrics

TDLR #TABS2025017138
$1.2M
Project Value
58,800
Square Feet
$20/sqft
Cost/SqFt
1 year
Duration
Registered:Apr 21, 2025
Start:Jun 30, 2025
Target:Jul 3, 2026
๐Ÿ“

Review Complete

Design review complete, construction may proceed

Al Rollins Neighborhood Park Phase 1 is a Renovation/Alteration project located at 3311 SW GREEN OAKS BLVD, Arlington, TX 76017 in Arlington, Texas. The project has an estimated value of $1.2M covering 58,800 sq ft. City of Arlington Parks and Recreation Department is the property owner and Parkhill is the design firm of record. The project was registered with TDLR on April 21, 2025.

โ“Frequently Asked Questions

What is Al Rollins Neighborhood Park Phase 1?

Al Rollins Neighborhood Park Phase 1 is a renovation/alteration project at 3311 SW GREEN OAKS BLVD in Arlington, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Demolition, Earthwork, Vehicular Concrete Paving, Pedestrian Concrete Paving, Decomposed Granite Paving, Utilities, Storm Drainage, Concrete Mowedge, Retaining Wall, Concrete Steps, Playground Equipment, Poured-in-Place S

Is Al Rollins Neighborhood Park Phase 1 open in Arlington?

Al Rollins Neighborhood Park Phase 1 is currently under construction in Arlington, TX. Its current TDLR status is "Review Complete".

Where is Al Rollins Neighborhood Park Phase 1 located?

Al Rollins Neighborhood Park Phase 1 is located at 3311 SW GREEN OAKS BLVD, Arlington, TX, 76017, in Tarrant County.

Who is the owner or developer of Al Rollins Neighborhood Park Phase 1?

City of Arlington Parks and Recreation Department is the property owner/developer of record for Al Rollins Neighborhood Park Phase 1, per its TDLR project registration.

Who is the architect or design firm for Al Rollins Neighborhood Park Phase 1?

Parkhill is the design firm of record for Al Rollins Neighborhood Park Phase 1, according to its TDLR filing.

How much does Al Rollins Neighborhood Park Phase 1 cost and how big is it?

Al Rollins Neighborhood Park Phase 1 has an estimated construction value of $1.2M and approximately 58,800 square feet (about $20/sqft), based on its TDLR filing.

๐Ÿ“‹Scope of Work

Demolition, Earthwork, Vehicular Concrete Paving, Pedestrian Concrete Paving, Decomposed Granite Paving, Utilities, Storm Drainage, Concrete Mowedge, Retaining Wall, Concrete Steps, Playground Equipment, Poured-in-Place S

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

๐Ÿ“…Compliance Timeline

Project Registered
April 21, 2025
Review Complete
April 21, 2025
Construction Start
June 30, 2025
Expected Completion
July 3, 2026

๐Ÿ“…Project Timeline

Filed

Apr 21, 2025

Review Complete

Apr 21, 2025

Inspection Complete

Closed

Get alerts for Tarrant

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists