Design review complete, construction may proceed
ACC RR Applied Tech. Expan.- Pkg. 6 HART Interior Finish-Out is a Type 9003 project located at 4400 College Park Drive in Round Rock, Texas. The project has an estimated value of $1.4M covering 4,935 sq ft. Austin Community College District is the property owner and PBK is the design firm of record. The project was registered with TDLR on April 22, 2025.
INTERIOR FINISH-OUT OF SHELL SPACE FOR HEATING, AIR CONDITIONING, & REFRIGERATION TECHNOLOGY CLASSROOMS AND LAB.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Apr 22, 2025
Review Complete
Apr 22, 2025
Inspection Complete
Closed
Building permits found at or near this location
Full residential electrical service rebuild. New 200 amp lever lock meter base. New 200 amp main breaker panel New grounding as needed. Will require temporary disconnect from Austin Energy
Interior remodel- relocate staircase create room upstairs powder room below stairs.
Interior remodel- relocate staircase create room upstairs powder room below stairs.
Interior remodel- relocate staircase create room upstairs powder room below stairs.
Replace backflow preventer