Urth Caffe Bakery
Urth Caffe Bakery is a renovation/alteration project at 104 Medina St., Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $800K across about 1,908 sq ft.
๐Project Metrics
TDLR #TABS2025017642Review Complete
Design review complete, construction may proceed
Urth Caffe Bakery is a Renovation/Alteration project located at 104 Medina St., Austin, TX 78702 in Austin, Texas. The project has an estimated value of $800K covering 1,908 sq ft. Adam Haidar is the property owner. The project was registered with TDLR on April 28, 2025.
โFrequently Asked Questions
What is Urth Caffe Bakery?
Urth Caffe Bakery is a renovation/alteration project at 104 Medina St. in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Project consists of renovation to existing building (wd framed structure) to convert to a bakery commissary building.
Is Urth Caffe Bakery open in Austin?
Urth Caffe Bakery is currently under construction in Austin, TX. Its current TDLR status is "Review Complete".
Where is Urth Caffe Bakery located?
Urth Caffe Bakery is located at 104 Medina St., Austin, TX, 78702, in Travis County.
Who is the owner or developer of Urth Caffe Bakery?
Adam Haidar is the property owner/developer of record for Urth Caffe Bakery, per its TDLR project registration.
How much does Urth Caffe Bakery cost and how big is it?
Urth Caffe Bakery has an estimated construction value of $800K and approximately 1,908 square feet (about $419/sqft), based on its TDLR filing.
๐Scope of Work
Project consists of renovation to existing building (wd framed structure) to convert to a bakery commissary building.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Apr 28, 2025
Review Complete
Apr 28, 2025
Inspection Complete
Closed
๐Related Projects
๐คSame Owner
$3.1M total๐Related City Permits
Building permits found at or near this location
ev install
Express: Install 5 helical piers
Express - Replace 7Existing windows - size for size Replace 1 existing entry door
Express- Tub to shower conversion in master bathroom. Replace walls in shower. Replace ceiling fan in master bedroom.
Replacement of complete existing central heat and air system with or without duct work