Zabalist
ZabalistTexas Construction
๐Ÿ  Home
๐Ÿ“‹ Directory
๐Ÿ’Ž Pricing๐Ÿ“Š Data
Sign InCreate Account
Zabalist
ZabalistTexas Construction

The most comprehensive Texas construction intelligence platform. Search verified contractors, track permits, and explore projects across the state.

โœ“ Verified DataFree to Search

Directory

  • Contractors
  • Builders
  • Architects
  • Developers
  • Property Owners

Construction Data

  • Building Permits
  • State Projects
  • Site Plans
  • Texas RFPs & Bids
  • Browse by City
  • Browse by County

Free Tools

  • Contractor License Lookup
  • Permit Cost Estimator
  • Free Contractor Badges
  • About Zabalist
  • Contact Us

ยฉ 2026 Smart Austin LLC d/b/a Moon Sherpa Labs. All rights reserved.

TermsPrivacyCookiesDo Not SellAccessibilityDMCA
Data from verified public sources. Not affiliated with any government agency.
  1. Home
  2. /
  3. Projects
  4. /
  5. Travis
๐Ÿ“Review Complete๐Ÿ”ง Alteration/Renovation๐Ÿ’ต This project is privately funded, on private land for private use.

NXP H2 Generation & Distribution

3501 Ed Bluestein Blvd., Austin, TX, 78721
Construction50%

๐Ÿ“ŠProject Metrics

TDLR #TABS2025017901
$3.2M
Project Value
1,150
Square Feet
$2.78K/sqft
Cost/SqFt
5 months
Duration
Registered:Apr 30, 2025
Start:May 12, 2025
Target:Oct 17, 2025
๐Ÿ“

Review Complete

Design review complete, construction may proceed

NXP H2 Generation & Distribution is a Alteration/Renovation project located at 3501 Ed Bluestein Blvd. in Austin, Texas. The project has an estimated value of $3.2M covering 1,150 sq ft. NXP Semiconductor is the property owner and Arete Engineering is the design firm of record. The project was registered with TDLR on April 30, 2025.

๐Ÿ“‹Scope of Work

Installation of 3 hydrogen electrolysis units in fan deck area on level 3 of building X. Piping will be routed from the fan deck to level 1 of building Y and levels 1 & 2 of building Z.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

๐Ÿ“…Compliance Timeline

Project Registered
April 30, 2025
Review Complete
April 30, 2025
Construction Start
May 12, 2025
Expected Completion
October 17, 2025

๐Ÿ“…Project Timeline

Filed

Apr 30, 2025

Review Complete

Apr 30, 2025

Inspection Complete

Closed

๐Ÿ“Location & Views

Open in MapsGet Directions|30.26621, -97.67067

๐Ÿ”—Related Projects

๐Ÿ‘คSame Owner

$18.4M total
NXP - CDA Expansion
Austinยท$7.1M
NXP CCRO
Austinยท$1.2M
NXP Project 1 - CMP Expansion
Austinยท$6.9M

๐Ÿ›๏ธSame Design Firm

$5.2M total
HVAC Showroom Remodel
El Pasoยท$59K
NXP CCRO
Austinยท$1.2M
Chemical Dispense Upgrades Phase 2
Round Rockยท$750K

๐Ÿ“Nearby Projects

Within 1 km
Bolm East Turn Lanes
US 183 NBFR at Linger Lane/Howard Road, Austin, TX 78721ยท$280K
Harold Court SC11 Restroom-Break Room Addition
6209 Harold Court Bldg. 2ยท$200K
Austin operations Center Renovation to the Second Floor Suite
3301 Hibbetts Roadยท$100K
Harold Court Service Center- WPD Campus Improvements
6301 Harold CT, Austin, TX 78721ยท$375K

๐Ÿ“„Related City Permits

Building permits found at or near this location

3501 ED BLUESTEIN BLVD NB BLDG X
0.69 mi away

Interior remodel to existing Lt manufacturing areas.

ActiveBuilding PermitRemodelMar 2026
View Details
2026-029434 BP
๐Ÿ”งNXP USA, Inc.
3501 HOLLYWOOD AVE
3.38 mi away

T-Pole Temporary post for power requesting power for construction ref. 2026-025237 BP

FinalElectrical PermitHomebuilder LoopMar 2026
View Details
2026-033219 EP
๐Ÿ”งBeltran Electric
3501 HOLLYWOOD AVE
3.38 mi away

Survey may be required at inspection stage to verify impervious cover (45% of lot size is allowed to be impervious surface) Requires an enclosure device for all Single-Family residences. The fence must be at least 4ft in height with a maximum gate opening of 4ft as well. The gate must be equipped with both self-closing and self-locking mechanisms.

ActiveElectrical PermitAddition and RemodelMar 2026
View Details
2026-025237 EP
๐Ÿ”งBeltran Electric
3501 MOUNT BONNELL RD
7.10 mi away

New spa inside existing pool New concrete sundeck Adding concrete steps and landing

ActivePlumbing PermitNewMar 2026
View Details
2024-059721 PP
๐Ÿ”งPK PLUMBING
3501 MOUNT BONNELL RD
7.10 mi away

Construct new driveway approach of 22 FT. No sidewalk inspection per plan review.

ActiveDriveway / SidewalksNewMar 2026
View Details
2026-002927 DS

Quick Actions

View on TDLRSatellite View
TDLR ID: TABS2025017901

Property Owner

๐Ÿ‘ค
NXP Semiconductor
Contact: Chris Tondre
4 projects ยท $18.4M
View all projects
3501 Ed Bluestein Blvd., Austin, Texas 78721
(512) 933-3959

Design Firm

๐Ÿ›๏ธ
Arete Engineering
4 projects ยท $5.2M
View company profile
4301 W. William Cannon Dr. Ste. B-150 #423, Austin, Texas 78749
(512) 265-1075

Registered Accessibility Specialist

๐Ÿ“‹
MARK S,ROBINSON
RAS #1561
18704 JANA PATRICE DR, PFLUGERVILLE, TX 78660
(512) 459-2121

Explore Area

๐Ÿ™๏ธ
Austin
View city projects
๐Ÿ—บ๏ธ
Travis County
View county projects
๐Ÿ“ฎ
ZIP 78721
View zip code projects

Find Professionals

๐Ÿ”จ
Contractors in Austin
Licensed contractors directory
๐Ÿ—๏ธ
Builders in Austin
Home & commercial builders
๐Ÿ“
Architects in Austin
Architecture & design firms

Get alerts for Travis

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists
Explore All Projects