Basey Construction Office
๐Project Metrics
TDLR #TABS2025020234Review Complete
Design review complete, construction may proceed
๐Scope of Work
New construction of Basey Construction office
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐Nearby Projects
Within 1 km๐Related City Permits
Building permits found at or near this location
Inground pool with auto-cover spa. Flatwork impervious removal from existing side walk driveway and uncovered patio
Siding Install and replace windows with same size
Preserve and renovate existing house and add connected addition. Run existing elect service underground Redo driveway front steps and beck deck. Preserve and renovate existing house and add connected addition redo driveway front entry steps and back deck pay fee instead of sidewalk installation
Preserve and renovate existing house and add connected addition. Run existing elect service underground Redo driveway front steps and beck deck. Preserve and renovate existing house and add connected addition redo driveway front entry steps and back deck pay fee instead of sidewalk installation
ePlan: Residential Expedited Review - New pool for single family residence 13 X 19