Richardson is a renovation/alteration project at 6740 Signat Dr. Suite 100, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Mar 2026). The project has an estimated value of $1.4M across about 193,438 sq ft.
Final inspection completed, awaiting project closure
Richardson is a Renovation/Alteration project located at 6740 Signat Dr. Suite 100, Houston, TX 77041 in Houston, Texas. The project has an estimated value of $1.4M covering 193,438 sq ft. Cabot Properties is the property owner and Method Architecture is the design firm of record. The project was registered with TDLR on June 2, 2025.
Richardson is a renovation/alteration project at 6740 Signat Dr. Suite 100 in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior office remodel (6120sf) in an existing building including factory (48321sf) and wareshouse (138997)
Construction on Richardson is complete โ TDLR records show the project passed its required accessibility inspection in Mar 2026. The building is finished and very likely open.
Richardson is located at 6740 Signat Dr. Suite 100, Houston, TX, 77041, in Harris County.
Cabot Properties is the property owner/developer of record for Richardson, per its TDLR project registration.
Method Architecture is the design firm of record for Richardson, according to its TDLR filing.
Richardson has an estimated construction value of $1.4M and approximately 193,438 square feet (about $7/sqft), based on its TDLR filing.
Interior office remodel (6120sf) in an existing building including factory (48321sf) and wareshouse (138997)
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Jun 2, 2025
Review Complete
Jun 2, 2025
Inspection Complete
Mar 25, 2026
Closed
296d
Construction phase