Pipedream Rapid Fulfillment Center Underground Network
📊Project Metrics
TDLR #TABS2025020507Project Closed
Project has been completed and closed
📋Scope of Work
Underground network consisting of 24" and 72" diameter pipe, two circular vaults, restoration of disturbed concrete as required, above ground installation of three (3) pickup kiosks, and overhead canopy installation.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
📅Compliance Timeline
📄Related City Permits
Building permits found at or near this location
Express- Existing foundation repair as per scope of work attached
New inground pool and decking
Request to disconnect We plan to remove the old main electrical panel on the exterior of the house then we will install a 125 amp main breaker emergency disconnect. We will also upgrade the grounding system and install a whole house surge protector.
Temporary power pole Ref 2025-080322 BP
Water heater installation.