Sachse is a renovation/alteration project at 7200 State Hwy 78, Sachse, in Collin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Mar 2026). The project has an estimated value of $150K across about 5,034 sq ft.
Project has been completed and closed
Sachse is a Renovation/Alteration project located at 7200 State Hwy 78, Sachse, TX 75048 in Sachse, Texas. The project has an estimated value of $150K covering 5,034 sq ft. KB Investment Group, LLC is the property owner and idGROUP is the design firm of record. The project was registered with TDLR on June 6, 2025.
Sachse is a renovation/alteration project at 7200 State Hwy 78 in Sachse, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: The scope of this project is a non-structural first generation interior finish-out in an existing single floor suite for the above named tenant. Scope includes HVC, plumbing, electrical.
Construction on Sachse is complete โ TDLR records show the project passed its required accessibility inspection in Mar 2026. The building is finished and very likely open.
Sachse is located at 7200 State Hwy 78, Sachse, TX, 75048, in Collin County.
KB Investment Group, LLC is the property owner/developer of record for Sachse, per its TDLR project registration.
idGROUP is the design firm of record for Sachse, according to its TDLR filing.
Sachse has an estimated construction value of $150K and approximately 5,034 square feet (about $30/sqft), based on its TDLR filing.
The scope of this project is a non-structural first generation interior finish-out in an existing single floor suite for the above named tenant. Scope includes HVC, plumbing, electrical.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Jun 6, 2025
Review Complete
Jun 6, 2025
Inspection Complete
Jan 12, 2026
Closed
Mar 27, 2026
220d
Construction phase