MAKE ART STUDIO is a renovation/alteration project at 25903 ELMFIELD DR SUITE 200, Spring, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2026). The project has an estimated value of $98K across about 2,250 sq ft.
Final inspection completed, awaiting project closure
MAKE ART STUDIO is a Renovation/Alteration project located at 25903 ELMFIELD DR SUITE 200, Spring, TX 77389 in Spring, Texas. The project has an estimated value of $98K covering 2,250 sq ft. Elmfield Holdings LLC is the property owner and ARCHCOS is the design firm of record. The project was registered with TDLR on June 10, 2025.
MAKE ART STUDIO is a renovation/alteration project at 25903 ELMFIELD DR SUITE 200 in Spring, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Commercial Local Remodel for 2 Art Classrooms, one for Adults & one for children. Include: Reception, Library, Restrooms, Utility Room, and Storage.
Construction on MAKE ART STUDIO is complete โ TDLR records show the project passed its required accessibility inspection in Jan 2026. The building is finished and very likely open.
MAKE ART STUDIO is located at 25903 ELMFIELD DR SUITE 200, Spring, TX, 77389, in Harris County.
Elmfield Holdings LLC is the property owner/developer of record for MAKE ART STUDIO, per its TDLR project registration.
ARCHCOS is the design firm of record for MAKE ART STUDIO, according to its TDLR filing.
MAKE ART STUDIO has an estimated construction value of $98K and approximately 2,250 square feet (about $44/sqft), based on its TDLR filing.
Commercial Local Remodel for 2 Art Classrooms, one for Adults & one for children. Include: Reception, Library, Restrooms, Utility Room, and Storage.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Jun 10, 2025
Review Complete
Jun 10, 2025
Inspection Complete
Jan 9, 2026
Closed
213d
Construction phase