GLO 30 FACIAL SPA
๐Project Metrics
TDLR #TABS2025021075Review Complete
Design review complete, construction may proceed
๐Scope of Work
conduct alterations to install design criteria for GLO 30 franchise. add bottle filler to existing plumbing systems, add electrical components specific to the GLO 30 operations, adjust existing hvac ducts and grille placement.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$2.5M total๐Related City Permits
Building permits found at or near this location
Replace old meter and panel with new 200R Meter Base and 200A Main breaker panel
Excavate 10 tunnel to repair main drain line under house & excavate 45 trench to repair main drain line in yard
we will be trenching and replacing 65ft of sewer line that starts at the side of the house and runs to the front yard.
Unit B New 2-story duplex unit 3 bed/2.5 bathroom with covered porch and covered patio
Unit A New 2-story duplex unit 3 bed/2.5 bed with covered porch and covered patio