Southwest Energy
Southwest Energy is a renovation/alteration project at 1400 Post Oak Blvd. Suite 1050, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2025). The project has an estimated value of $391K across about 4,572 sq ft.
๐Project Metrics
TDLR #TABS2025021285Project Closed
Project has been completed and closed
Southwest Energy is a Renovation/Alteration project located at 1400 Post Oak Blvd. Suite 1050, Houston, TX 77056 in Houston, Texas. The project has an estimated value of $391K covering 4,572 sq ft. FOUR OAKS PLACE OPERATING LP is the property owner and Inventure is the design firm of record. The project was registered with TDLR on June 13, 2025.
โFrequently Asked Questions
What is Southwest Energy?
Southwest Energy is a renovation/alteration project at 1400 Post Oak Blvd. Suite 1050 in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior renovation of existing suite which will include all new finishes, light fixtures, ceiling grid, power, and plumbing for a new breakroom
Is Southwest Energy open in Houston?
Construction on Southwest Energy is complete โ TDLR records show the project passed its required accessibility inspection in Jun 2025. The building is finished and very likely open.
Where is Southwest Energy located?
Southwest Energy is located at 1400 Post Oak Blvd. Suite 1050, Houston, TX, 77056, in Harris County.
Who is the owner or developer of Southwest Energy?
FOUR OAKS PLACE OPERATING LP is the property owner/developer of record for Southwest Energy, per its TDLR project registration.
Who is the architect or design firm for Southwest Energy?
Inventure is the design firm of record for Southwest Energy, according to its TDLR filing.
How much does Southwest Energy cost and how big is it?
Southwest Energy has an estimated construction value of $391K and approximately 4,572 square feet (about $86/sqft), based on its TDLR filing.
๐Scope of Work
Interior renovation of existing suite which will include all new finishes, light fixtures, ceiling grid, power, and plumbing for a new breakroom
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jun 13, 2025
Review Complete
Inspection Complete
Closed
Jun 13, 2025