Tokyo Electron 8th Floor Expansion is a renovation/alteration project at 401 S. 1st Street, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $2.1M across about 3,600 sq ft.
Design review complete, construction may proceed
Tokyo Electron 8th Floor Expansion is a Renovation/Alteration project located at 401 S. 1st Street, Austin, TX 78704 in Austin, Texas. The project has an estimated value of $2.1M covering 3,600 sq ft. SRPF A QR RIVERSOUTH LLC is the property owner. The project was registered with TDLR on July 1, 2025.
Tokyo Electron 8th Floor Expansion is a renovation/alteration project at 401 S. 1st Street in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Tenant Finish-out of warm shell lease space on Lvl 8 of the RiverSouth Bldg. The tenant is expanding their existing lease into this unoccupied 3,600 sqft. The project includes new interior walls, doors, new electrical, mechanical and finโฆ
Tokyo Electron 8th Floor Expansion is currently under construction in Austin, TX. Its current TDLR status is "Review Complete".
Tokyo Electron 8th Floor Expansion is located at 401 S. 1st Street, Austin, TX, 78704, in Travis County.
SRPF A QR RIVERSOUTH LLC is the property owner/developer of record for Tokyo Electron 8th Floor Expansion, per its TDLR project registration.
Tokyo Electron 8th Floor Expansion has an estimated construction value of $2.1M and approximately 3,600 square feet (about $583/sqft), based on its TDLR filing.
Tenant Finish-out of warm shell lease space on Lvl 8 of the RiverSouth Bldg. The tenant is expanding their existing lease into this unoccupied 3,600 sqft. The project includes new interior walls, doors, new electrical, mechanical and finishes.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Jul 1, 2025
Review Complete
Jan 4, 2026
Inspection Complete
Closed
187d
Review duration
Building permits found at or near this location
*S.M.A.R.T. HOUSING* *GREEN BUILDING* ePlan: Residential Expedited Review - New construction of a 3-Story Townhome [3bed 3.5bath] with Attached Garage. 4010 MONTAGE PASS
*S.M.A.R.T. HOUSING* *GREEN BUILDING* ePlan: Residential Expedited Review - New construction of a 3-Story Townhome [3bed 3.5bath] with Attached Garage. 4012 MONTAGE PASS
*S.M.A.R.T. HOUSING* *GREEN BUILDING* ePlan: Residential Expedited Review - New construction of a 3-Story Townhome [3bed 3.5bath] with Attached Garage. 4014 MONTAGE PASS
Express: Replace windows (like for like)
*S.M.A.R.T. HOUSING* *GREEN BUILDING* ePlan: Residential Expedited Review - New construction of a 3-Story Townhome [3bed 3.5bath] with Attached Garage. 4010 MONTAGE PASS