New 3T MRI Suite
New 3T MRI Suite is a renovation/alteration project at 700 Scott & White Dr., College Station, in Brazos County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Mar 2026). The project has an estimated value of $1.2M across about 1,200 sq ft.
๐Project Metrics
TDLR #TABS2025022679Inspection Complete
Final inspection completed, awaiting project closure
New 3T MRI Suite is a Renovation/Alteration project located at 700 Scott & White Dr., College Station, TX 77845 in College Station, Texas. The project has an estimated value of $1.2M covering 1,200 sq ft. Baylor Scott & White Health is the property owner and BSA Design is the design firm of record. The project was registered with TDLR on July 3, 2025.
โFrequently Asked Questions
What is New 3T MRI Suite?
New 3T MRI Suite is a renovation/alteration project at 700 Scott & White Dr. in College Station, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Existing shell space buildout for a new 3T MRI imaging suite to contain a control room, code required holding area and equipment room. New mechanical and shielding will be required for the MRI.
Is New 3T MRI Suite open in College Station?
Construction on New 3T MRI Suite is complete โ TDLR records show the project passed its required accessibility inspection in Mar 2026. The building is finished and very likely open.
Where is New 3T MRI Suite located?
New 3T MRI Suite is located at 700 Scott & White Dr., College Station, TX, 77845, in Brazos County.
Who is the owner or developer of New 3T MRI Suite?
Baylor Scott & White Health is the property owner/developer of record for New 3T MRI Suite, per its TDLR project registration.
Who is the architect or design firm for New 3T MRI Suite?
BSA Design is the design firm of record for New 3T MRI Suite, according to its TDLR filing.
How much does New 3T MRI Suite cost and how big is it?
New 3T MRI Suite has an estimated construction value of $1.2M and approximately 1,200 square feet (about $1.00K/sqft), based on its TDLR filing.
๐Scope of Work
Existing shell space buildout for a new 3T MRI imaging suite to contain a control room, code required holding area and equipment room. New mechanical and shielding will be required for the MRI.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jul 3, 2025
Review Complete
Jul 3, 2025
Inspection Complete
Mar 12, 2026
Closed
252d
Construction phase