Wade College is a renovation/alteration project at 8350 North Central Expressway, Suite M2200, Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2026). The project has an estimated value of $650K across about 10,429 sq ft.
Project has been completed and closed
Wade College is a Renovation/Alteration project located at 8350 North Central Expressway, Suite M2200, Dallas, TX 75206 in Dallas, Texas. The project has an estimated value of $650K covering 10,429 sq ft. FCAW CC PropCo., LLC is the property owner and Go Studio is the design firm of record. The project was registered with TDLR on July 10, 2025.
Wade College is a renovation/alteration project at 8350 North Central Expressway, Suite M2200 in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior renovation of existing office space in a 2-story multi-tenant building.
Construction on Wade College is complete โ TDLR records show the project passed its required accessibility inspection in May 2026. The building is finished and very likely open.
Wade College is located at 8350 North Central Expressway, Suite M2200, Dallas, TX, 75206, in Dallas County.
FCAW CC PropCo., LLC is the property owner/developer of record for Wade College, per its TDLR project registration.
Go Studio is the design firm of record for Wade College, according to its TDLR filing.
Wade College has an estimated construction value of $650K and approximately 10,429 square feet (about $62/sqft), based on its TDLR filing.
Interior renovation of existing office space in a 2-story multi-tenant building.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Jul 10, 2025
Review Complete
Jul 10, 2025
Inspection Complete
Jan 31, 2026
Closed
May 3, 2026
205d
Construction phase