Cuba LLama
Cuba LLama is a renovation/alteration project at 4245 N. Dixie Blvd., Odessa, in Ector County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2025). The project has an estimated value of $50K across about 1,640 sq ft.
๐Project Metrics
TDLR #TABS2025023436Inspection Complete
Final inspection completed, awaiting project closure
Cuba LLama is a Renovation/Alteration project located at 4245 N. Dixie Blvd., Odessa, TX 79762 in Odessa, Texas. The project has an estimated value of $50K covering 1,640 sq ft. GORDON SHERWOOD LLC is the property owner. The project was registered with TDLR on July 14, 2025.
โFrequently Asked Questions
What is Cuba LLama?
Cuba LLama is a renovation/alteration project at 4245 N. Dixie Blvd. in Odessa, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Remodel of the local, new ac, new electrical wiring and drop ceiling. Bathroom remodel.
Is Cuba LLama open in Odessa?
Construction on Cuba LLama is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2025. The building is finished and very likely open.
Where is Cuba LLama located?
Cuba LLama is located at 4245 N. Dixie Blvd., Odessa, TX, 79762, in Ector County.
Who is the owner or developer of Cuba LLama?
GORDON SHERWOOD LLC is the property owner/developer of record for Cuba LLama, per its TDLR project registration.
How much does Cuba LLama cost and how big is it?
Cuba LLama has an estimated construction value of $50K and approximately 1,640 square feet (about $30/sqft), based on its TDLR filing.
๐Scope of Work
Remodel of the local, new ac, new electrical wiring and drop ceiling. Bathroom remodel.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jul 14, 2025
Review Complete
Jul 14, 2025
Inspection Complete
Dec 20, 2025
Closed
159d
Construction phase