Bechtel Building 4- Level 12 is a renovation/alteration project at 2103 City West Blvd, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2026). The project has an estimated value of $4.6M across about 22,000 sq ft.
Project has been completed and closed
Bechtel Building 4- Level 12 is a Renovation/Alteration project located at 2103 City West Blvd, Houston, TX 77042 in Houston, Texas. The project has an estimated value of $4.6M covering 22,000 sq ft. CWP Building 4, LLC is the property owner and Kirksey Architecture is the design firm of record. The project was registered with TDLR on July 21, 2025.
Bechtel Building 4- Level 12 is a renovation/alteration project at 2103 City West Blvd in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: NEW INTERIOR BUILD OUT OF A FULL FLOOR IN AN EXISTING BUILDING
Construction on Bechtel Building 4- Level 12 is complete โ TDLR records show the project passed its required accessibility inspection in Jun 2026. The building is finished and very likely open.
Bechtel Building 4- Level 12 is located at 2103 City West Blvd, Houston, TX, 77042, in Harris County.
CWP Building 4, LLC is the property owner/developer of record for Bechtel Building 4- Level 12, per its TDLR project registration.
Kirksey Architecture is the design firm of record for Bechtel Building 4- Level 12, according to its TDLR filing.
Bechtel Building 4- Level 12 has an estimated construction value of $4.6M and approximately 22,000 square feet (about $208/sqft), based on its TDLR filing.
NEW INTERIOR BUILD OUT OF A FULL FLOOR IN AN EXISTING BUILDING
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Jul 21, 2025
Review Complete
Jul 21, 2025
Inspection Complete
Feb 10, 2026
Closed
Jun 20, 2026
204d
Construction phase