Swing Club
Swing Club is a renovation/alteration project at 1530 Washington Drive, Waco, in McLennan County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $125K across about 2,419 sq ft.
๐Project Metrics
TDLR #TABS2025024884Project Registered
Project has been registered with TDLR and is in pre-construction phase
Swing Club is a Renovation/Alteration project located at 1530 Washington Drive in Waco, Texas. The project has an estimated value of $125K covering 2,419 sq ft. Angelo Fajardo is the property owner and Scales Engineering PLLC is the design firm of record. The project was registered with TDLR on July 31, 2025.
โFrequently Asked Questions
What is Swing Club?
Swing Club is a renovation/alteration project at 1530 Washington Drive in Waco, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: renovation and repurpose existing blg.
Is Swing Club open in Waco?
Swing Club is currently under construction in Waco, TX. Its current TDLR status is "Project Registered".
Where is Swing Club located?
Swing Club is located at 1530 Washington Drive, Waco, TX, 76701, in McLennan County.
Who is the owner or developer of Swing Club?
Angelo Fajardo is the property owner/developer of record for Swing Club, per its TDLR project registration.
Who is the architect or design firm for Swing Club?
Scales Engineering PLLC is the design firm of record for Swing Club, according to its TDLR filing.
How much does Swing Club cost and how big is it?
Swing Club has an estimated construction value of $125K and approximately 2,419 square feet (about $52/sqft), based on its TDLR filing.
๐Scope of Work
renovation and repurpose existing blg.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jul 31, 2025
Review Complete
Inspection Complete
Closed