TAQUERIA TRES SALSAS
TAQUERIA TRES SALSAS is a renovation/alteration project at 4140 W CAMP WISDOM RD #STE. B, Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $100K across about 1,445 sq ft.
๐Project Metrics
TDLR #TABS2025024999Review Complete
Design review complete, construction may proceed
TAQUERIA TRES SALSAS is a Renovation/Alteration project located at 4140 W CAMP WISDOM RD #STE. B, Dallas, TX 75237 in Dallas, Texas. The project has an estimated value of $100K covering 1,445 sq ft. 4140 CAMP WISDOM ASSET LLC is the property owner and BEAR DESIGN BUILD is the design firm of record. The project was registered with TDLR on August 2, 2025.
โFrequently Asked Questions
What is TAQUERIA TRES SALSAS?
TAQUERIA TRES SALSAS is a renovation/alteration project at 4140 W CAMP WISDOM RD #STE. B in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: REMODEL
Is TAQUERIA TRES SALSAS open in Dallas?
TAQUERIA TRES SALSAS is currently under construction in Dallas, TX. Its current TDLR status is "Review Complete".
Where is TAQUERIA TRES SALSAS located?
TAQUERIA TRES SALSAS is located at 4140 W CAMP WISDOM RD #STE. B, Dallas, TX, 75237, in Dallas County.
Who is the owner or developer of TAQUERIA TRES SALSAS?
4140 CAMP WISDOM ASSET LLC is the property owner/developer of record for TAQUERIA TRES SALSAS, per its TDLR project registration.
Who is the architect or design firm for TAQUERIA TRES SALSAS?
BEAR DESIGN BUILD is the design firm of record for TAQUERIA TRES SALSAS, according to its TDLR filing.
How much does TAQUERIA TRES SALSAS cost and how big is it?
TAQUERIA TRES SALSAS has an estimated construction value of $100K and approximately 1,445 square feet (about $69/sqft), based on its TDLR filing.
๐Scope of Work
REMODEL
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Aug 2, 2025
Review Complete
Aug 2, 2025
Inspection Complete
Closed