Duck Camp
Duck Camp is a renovation/alteration project at 220 S. Congress Ave. Suite 150, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2026). The project has an estimated value of $600K across about 5,710 sq ft.
๐Project Metrics
TDLR #TABS2025025072Inspection Complete
Final inspection completed, awaiting project closure
Duck Camp is a Renovation/Alteration project located at 220 S. Congress Ave. Suite 150, Austin, TX 78704 in Austin, Texas. The project has an estimated value of $600K covering 5,710 sq ft. Ramrock Yeti, JKC is the property owner. The project was registered with TDLR on August 4, 2025.
โFrequently Asked Questions
What is Duck Camp?
Duck Camp is a renovation/alteration project at 220 S. Congress Ave. Suite 150 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of existing office suite with small retail component in same suite. Includes mechanical, electrical and minor plumbing scope.
Is Duck Camp open in Austin?
Construction on Duck Camp is complete โ TDLR records show the project passed its required accessibility inspection in May 2026. The building is finished and very likely open.
Where is Duck Camp located?
Duck Camp is located at 220 S. Congress Ave. Suite 150, Austin, TX, 78704, in Travis County.
Who is the owner or developer of Duck Camp?
Ramrock Yeti, JKC is the property owner/developer of record for Duck Camp, per its TDLR project registration.
How much does Duck Camp cost and how big is it?
Duck Camp has an estimated construction value of $600K and approximately 5,710 square feet (about $105/sqft), based on its TDLR filing.
๐Scope of Work
Renovation of existing office suite with small retail component in same suite. Includes mechanical, electrical and minor plumbing scope.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Aug 4, 2025
Review Complete
Aug 4, 2025
Inspection Complete
May 14, 2026
Closed
283d
Construction phase
๐Related City Permits
Building permits found at or near this location
TPOLE REF. 2026-082957 BP
Additon of a broken RPZ on the auto pool fill
SOLAR ROOFTOP
Excavate 9 trench to repair main drain line under the house
Adding two dual port EV chargers to library parking lot