Courtyard Racquet Club Phase 01 is a renovation/alteration project at 5608 Courtyard Drive, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $300K across about 63,053 sq ft.
Design review complete, construction may proceed
Courtyard Racquet Club Phase 01 is a Renovation/Alteration project located at 5608 Courtyard Drive, Austin, TX 78731 in Austin, Texas. The project has an estimated value of $300K covering 63,053 sq ft. Hodde Corporation is the property owner and Hunter Tipps Architectural is the design firm of record. The project was registered with TDLR on August 7, 2025.
Courtyard Racquet Club Phase 01 is a renovation/alteration project at 5608 Courtyard Drive in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New Concrete for existing tennis courts, new fencing for courts, new court lighting for tennis courts
Courtyard Racquet Club Phase 01 is currently under construction in Austin, TX. Its current TDLR status is "Review Complete".
Courtyard Racquet Club Phase 01 is located at 5608 Courtyard Drive, Austin, TX, 78731, in Travis County.
Hodde Corporation is the property owner/developer of record for Courtyard Racquet Club Phase 01, per its TDLR project registration.
Hunter Tipps Architectural is the design firm of record for Courtyard Racquet Club Phase 01, according to its TDLR filing.
Courtyard Racquet Club Phase 01 has an estimated construction value of $300K and approximately 63,053 square feet (about $5/sqft), based on its TDLR filing.
New Concrete for existing tennis courts, new fencing for courts, new court lighting for tennis courts
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Aug 7, 2025
Review Complete
Aug 7, 2025
Inspection Complete
Closed
Building permits found at or near this location
dig a 3` x 3` entrance on the right side back corner of home and dig a 6 to 7 foot tunnel and redo all the branch lines in the master bathroom which includes one sink one bathtub and one toilet due to 6 to 7 foot belly.
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work hvac change out
irrigation install
Retroactively permit inground swimming pool and spa w/ reqd enclosure device. *heating/autofill*