45 Crossing Make Ready is a renovation/alteration project at 2700 Louis HennaBlvd, Suite 190, Round Rock, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2026). The project has an estimated value of $293K across about 2,096 sq ft.
Project has been completed and closed
45 Crossing Make Ready is a Renovation/Alteration project located at 2700 Louis HennaBlvd, Suite 190, Round Rock, TX 78664 in Round Rock, Texas. The project has an estimated value of $293K covering 2,096 sq ft. EastGroup Properties is the property owner and Method Architecture is the design firm of record. The project was registered with TDLR on August 22, 2025.
45 Crossing Make Ready is a renovation/alteration project at 2700 Louis HennaBlvd, Suite 190 in Round Rock, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior office remodel 2096sf in an existing building
Construction on 45 Crossing Make Ready is complete โ TDLR records show the project passed its required accessibility inspection in Jun 2026. The building is finished and very likely open.
45 Crossing Make Ready is located at 2700 Louis HennaBlvd, Suite 190, Round Rock, TX, 78664, in Williamson County.
EastGroup Properties is the property owner/developer of record for 45 Crossing Make Ready, per its TDLR project registration.
Method Architecture is the design firm of record for 45 Crossing Make Ready, according to its TDLR filing.
45 Crossing Make Ready has an estimated construction value of $293K and approximately 2,096 square feet (about $140/sqft), based on its TDLR filing.
Interior office remodel 2096sf in an existing building
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Aug 22, 2025
Review Complete
Aug 22, 2025
Inspection Complete
Feb 26, 2026
Closed
Jun 27, 2026
188d
Construction phase
Building permits found at or near this location
Express: reroof
Excavate 7 tunnel to repair main drain line under the house
Replacement of complete existing central heat and air system with or without duct work 4 Ton Daikin Fit Enhanced
Plumbing for New SFR in the ETJ (sq ft 2558)
Homebuilder Loop Austin 2 Mile ETJ Austin Energy