Sompo Finish Out
Sompo Finish Out is a renovation/alteration project at 5107 82nd Street, Suite 201, Lubbock, in Lubbock County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2026). The project has an estimated value of $2.2M across about 14,000 sq ft.
๐Project Metrics
TDLR #TABS2025026596Inspection Complete
Final inspection completed, awaiting project closure
Sompo Finish Out is a Renovation/Alteration project located at 5107 82nd Street, Suite 201, Lubbock, TX 79424 in Lubbock, Texas. The project has an estimated value of $2.2M covering 14,000 sq ft. Endurance Services Limited/SOMPO is the property owner and Chapman Harvey Architects, Inc is the design firm of record. The project was registered with TDLR on August 25, 2025.
โFrequently Asked Questions
What is Sompo Finish Out?
Sompo Finish Out is a renovation/alteration project at 5107 82nd Street, Suite 201 in Lubbock, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Finish out of existing office space
Is Sompo Finish Out open in Lubbock?
Construction on Sompo Finish Out is complete โ TDLR records show the project passed its required accessibility inspection in Jun 2026. The building is finished and very likely open.
Where is Sompo Finish Out located?
Sompo Finish Out is located at 5107 82nd Street, Suite 201, Lubbock, TX, 79424, in Lubbock County.
Who is the owner or developer of Sompo Finish Out?
Endurance Services Limited/SOMPO is the property owner/developer of record for Sompo Finish Out, per its TDLR project registration.
Who is the architect or design firm for Sompo Finish Out?
Chapman Harvey Architects, Inc is the design firm of record for Sompo Finish Out, according to its TDLR filing.
How much does Sompo Finish Out cost and how big is it?
Sompo Finish Out has an estimated construction value of $2.2M and approximately 14,000 square feet (about $157/sqft), based on its TDLR filing.
๐Scope of Work
Finish out of existing office space
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Aug 25, 2025
Review Complete
Aug 25, 2025
Inspection Complete
Jun 20, 2026
Closed
299d
Construction phase