Smoothie Shop
Smoothie Shop is a renovation/alteration project at 5200 ross Rd Ste 150, Del Valle, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $60K across about 1,000 sq ft.
๐Project Metrics
TDLR #TABS2025027098Review Complete
Design review complete, construction may proceed
Smoothie Shop is a Renovation/Alteration project located at 5200 ross Rd Ste 150, Del Valle, TX 78617 in Del Valle, Texas. The project has an estimated value of $60K covering 1,000 sq ft. GAB Partners Inc is the property owner and KO Design Group LLC is the design firm of record. The project was registered with TDLR on August 30, 2025.
โFrequently Asked Questions
What is Smoothie Shop?
Smoothie Shop is a renovation/alteration project at 5200 ross Rd Ste 150 in Del Valle, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of existing space from meat market to smoothie shop
Is Smoothie Shop open in Del Valle?
Smoothie Shop is currently under construction in Del Valle, TX. Its current TDLR status is "Review Complete".
Where is Smoothie Shop located?
Smoothie Shop is located at 5200 ross Rd Ste 150, Del Valle, TX, 78617, in Travis County.
Who is the owner or developer of Smoothie Shop?
GAB Partners Inc is the property owner/developer of record for Smoothie Shop, per its TDLR project registration.
Who is the architect or design firm for Smoothie Shop?
KO Design Group LLC is the design firm of record for Smoothie Shop, according to its TDLR filing.
How much does Smoothie Shop cost and how big is it?
Smoothie Shop has an estimated construction value of $60K and approximately 1,000 square feet (about $60/sqft), based on its TDLR filing.
๐Scope of Work
Renovation of existing space from meat market to smoothie shop
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Aug 30, 2025
Review Complete
Mar 13, 2026
Inspection Complete
Closed
195d
Review duration
๐Related Projects
๐คSame Owner
$1.7M total๐๏ธSame Design Firm
$93.6M total๐Related City Permits
Building permits found at or near this location
Addition/remodel- Addition to SFR adding one bedroom and bathroom to the ground floor bonus room to level 2 over the existing garage. Expanding 2 existing upstairs bedrooms.
Repair break under home on sewer line access by tunnel
Replacement of an existing water heater WATER HEATER TANKLESS CHANGE-OUT
Construct new sidewalk of 47 LF 2025 027701 000 00 SSI SP-2019-0557C
repipe gas line to furnace from plugged tee to furnace run dedicated line from meter to tankless and resolve venting issue