Fanatics
Fanatics is a renovation/alteration project at 200 E Bethany Drive, Allen, in Collin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $350K across about 1,000 sq ft.
๐Project Metrics
TDLR #TABS2026000012Review Complete
Design review complete, construction may proceed
Fanatics is a Renovation/Alteration project located at 200 E Bethany Drive, Allen, TX 75002 in Allen, Texas. The project has an estimated value of $350K covering 1,000 sq ft. FaroPoint is the property owner and IA Interior Architects, Inc is the design firm of record. The project was registered with TDLR on September 2, 2025.
โFrequently Asked Questions
What is Fanatics?
Fanatics is a renovation/alteration project at 200 E Bethany Drive in Allen, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Adding a demising wall to separate warehouse spaces.
Is Fanatics open in Allen?
Fanatics is currently under construction in Allen, TX. Its current TDLR status is "Review Complete".
Where is Fanatics located?
Fanatics is located at 200 E Bethany Drive, Allen, TX, 75002, in Collin County.
Who is the owner or developer of Fanatics?
FaroPoint is the property owner/developer of record for Fanatics, per its TDLR project registration.
Who is the architect or design firm for Fanatics?
IA Interior Architects, Inc is the design firm of record for Fanatics, according to its TDLR filing.
How much does Fanatics cost and how big is it?
Fanatics has an estimated construction value of $350K and approximately 1,000 square feet (about $350/sqft), based on its TDLR filing.
๐Scope of Work
Adding a demising wall to separate warehouse spaces.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Sep 2, 2025
Review Complete
Sep 2, 2025
Inspection Complete
Closed